Mr Poulie’s world travels are very well documented
at: www.pddeux.nl
Use www.freetranslation.com/web.asp
if your Dutch is like mine.
as
at: 20 September 2008
... Safely Home - SDC Unit returned for Tear Down
Analysis. Photo's below.
This photo shows the unit as it was returned post
cleaning to remove marine growth

Attachment Bolt removed showing wear patterns on PETP washer and Bolt
OD - Not measurable

Blade / Pitch Screw impact point showing very little wear - impact
point is less than 0.1 mm deep

Boss showing the Vecytran path in both Ahead and Reverse

Vectran path between the Blade and Body exposed - a major wear
section

This shows vectran as removed around the Boss with high stress points
on the corners

Shows the Vectran inside the body with the blades open so as to expose
the Vectran that has been moving around the body corners during opening

Shows the Vectran tail around the blade internally which is under the
PETP washer

Here's
the route of his travels.
The above unit was installed at Florida and used until he returned to
Holland.
This was a period of some six months of continuous use and some 700
engine hours.